Tie Beam Fitting

The plan is to build the 2 side bents comprised of the top plates and their respective posts and braces. There is a second brace that connects the post of the bent to the Sections Tie Beam. The 2 bents will be placed and secured. Then each Tie Beam with braces in place will be flown into place. All cutting and trimming needs to be done before that so that each tenon can be started and maybe even completely inserted without to much trouble. Lifting straps and come alongs will pull the pieces together and hopefully it will all pull together nicely.

The videos below are the prep work on the Tie Beams

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s